The Ashburn Village Facilities and Grounds Department is responsible for the daily maintenance and improvement of all AVCA assets at locations to include the Sports Pavilion, Recreation Centers, HOA Building and all common areas. Staff also provides services to include snow removal, pool maintenance and assistance/oversight to all contractors who do work for AVCA.
Current Projects
Annual Lake "Renovational" Prunning
During the next several months (weather dependent) AVCA contractors will be conducting our annual "renovational prunning" of all AVCA lakes. This process is geared towards actively managing all growth on the lake shore lines. The goal is to keep all forms of growth maintained so as to protect the lake banks from current and future erosion, protect AVCA infastructure (i.e. walking paths, storm drains), protect residential properties and to strike a balance on the current and future growth of all landscaping to insure against future issues.
2/13/12: CLS crews will be working on our final two ponds.Heron and Killawog.
Street Lighting
We are currently replacing our older street lighting with new LED lights in our residential areas and along the main streets as needed.
Latest residential areas that were upgraded in 2011: AftonTerrace, Crew Square, Falmouth Court, Kings Arm/Royal Crest Square and Gala Circle.
Next residential areas for upgrade: Apollo Terrace, Allderwood and Misiletoe Terr, Rootstown/Lemon Springs and Mint Hill terrace.
|

|

|
Landscape Revitilization
All planting areas for the 2011 season have been completed. See "Master Landscape Planning Area" under "Helpful Links" below for a map of all revitilization areas.
Sections completed in 2009: B1 and B2 Sections completed in 2010: C2, C4 and D1 Sections completed in 2011: A4 and D3 Sections scheduled for 2012: C1,C3, D2 and B4

BEFORE AFTER
Walking Paths
Walking path work is done in conjuction with our annual Landscape Revitilization work. The trails that fall within the selected revitilization sections for landscaping are assessed and the ones in need of updating are fixed.
All 2011 walking path work is complete with the exception of one small section around Beech Lake. We will be returning in the early spring of 2012 to complete this work and to begin the assesment of the new trails that fall within the selected landscape revitilization areas for 2012. Enjoy your new paths !!
Recently Completed Projects
Pavilion/Ringold Cove/ Pandora Court Cove Work
AVCA contractors have finished the removal of Cattail and Bullrush and sediment in Ringold Cove and Pandora Cove on Pavilion Lake.
Private Court Street Sign Upgrades
The F&G Department is done replacing all of the old private court signage with new ones. Please see pictures below for this great new look.
New HOA Dock
New dock behind the HOA office. The F&G Department recently removed the old failing dock behind the HOA office and replaced it with a brand new structure made of composite wood. New composite benches were added as well. It's a great place for relaxing and letting the kids fish. Come check it out.

New Indoor pool lights.
The F&G Department recently installed new LED lighting at the indoor pool. Not only is this a great new look but we managed to significantly reduce our electrical consumption by replacing the old 400 watt metal halide bulbs in all of the old fixtures with 50 watt LED bulbs for the units shining down and 25 watt LED's for the units shining up.
New Paint on all of our signage.
The F&G department recently re-painted all of our major signage throughout the Village.
Presentations
AVCA Renovational Landscape Management Plan (Presented 1/24/2012)
Helpful Links
AVCA Lakes Map Master Landscape Plan Master Landscape Planning Area Section Map of Ashburn Village Tree Removal and Replacement Policy Snow Removal Policy VDOT Snow Removal Policy Vulture Mitigation USDA Vulture Brochure
|